Activity
|
Fees
|
|
Plan Review
|
|
|
Plat Review
|
$100.00
|
Per plat
|
Plan Review Construction
|
$100.00 + $0.01 per square foot
|
|
Plan Review for Sprinkler System
|
$100.00 + $0.002 per square foot
|
|
New Sprinkler System Installation
|
$100.00 + (1—25) $1.50 per head, (26 +) $0.50 per head
|
|
Sprinkler System Modification/Remodel
|
$50.00 + (1—25) $1.50 per head, (26 +) $0.50 per head
|
|
Plan Review for Fire Alarm System
|
$100.00 + $0.002 per square foot
|
|
New Fire Alarm System Installation
|
$100.00 + (1—25) $1.75 per device. (26 +) $0.75 per device
|
|
Fire Alarm Modification/Remodel
|
$50.00 + (1—25)$1.75 per device, (26 +) $0.75 per device
|
|
Fire Alarm Connected to Sprinkler System
|
$100.00
|
Per panel
|
Fire Alarm Panel Replacement
|
$100.00
|
Per panel
|
Plan Review for Vent Hood System
|
$180.00
|
$180.00 Per hood
|
Permits
|
|
|
Above-Ground Storage Tanks
|
$150.00
|
Per tank
|
Control Burning
|
$100.00
|
For every 30 days
|
Explosive (Transport)
|
$50.00
|
Per vehicle
|
Food Booth
|
$20.00
|
Per day
|
Fireworks Display
|
$250.00
|
Per event
|
LPG Tank
|
$50.00
|
Per tank
|
Mobile Refuel initial fee
|
$250.00
|
|
Mobile Refuel 1—3 vehicles
|
$200.00
|
|
Mobile Refuel 4—6 vehicles
|
$400.00
|
|
Mobile Refuel 7—10 vehicles
|
$600.00
|
|
Mobile Refuel 11 + vehicles
|
$800.00
|
|
Parade Float
|
$20.00
|
Per float
|
Pyrotechnics, Indoor
|
$50.00
|
Per event
|
Spray Paint Booths
|
$150.00
|
Per booth
|
Underground Storage Tanks
|
$150.00
|
Per tank
|
Used Clothing (Ropa Usada) small stores only
|
$100.00
|
|
Underground Fire Line
|
$50.00
|
Per line
|
Tents Permits
|
$50.00
|
Per tent
|
Inspections
|
|
|
After Hours Inspection
|
$200.00
|
Per hour
|
Airport
|
$100.00
|
|
Beer and Wine Permits Inspection
|
$100.00
|
|
Church
|
$50.00
|
|
Daycare or Similar Inspection
|
$50.00
|
|
Detention/Correctional
|
$100.00
|
|
Fire Inspection
|
$50.00
|
|
Fire Line Pressure Test
|
$50.00
|
Per line
|
Fuel Pump (each)
|
$50.00
|
Per pump
|
Hotel/Motel
|
$100.00
|
|
Hospital or Similar Inspection
|
$250.00 + $1.00 per Bed after 250 beds
|
|
Hydrostatic Test
|
$50.00
|
Per test
|
Monitoring Wells (Ignitable Liquids)
|
$50.00
|
Per well
|
Nursing Home or Similar Inspection
|
$150.00 + $1.00 per Bed after 150 beds
|
|
Rehab, Physical Therapy and Clinics
|
$100.00
|
|
Reinspection Fee
|
$100.00
|
|
Underground Tank Removal
|
$100.00
|
Per tank
|
Warehouse 0—50,000 sq. ft.
|
$100.00
|
|
Warehouse 50,001—200,000 sq. ft.
|
$200.00
|
|
Warehouse 200,001 + sq. ft.
|
$300.00
|
|
Operating without a Permit
|
Permit fee + 150% of Permit fee
|
|
Others
|
|
|
Fire Drill (Commercial)
|
$50.00
|
Per Fire Drill
|
Fire Equipment Demo/Training
|
$150.00
|
Per demo/training up to 40 people
|
Fire Report Copy
|
$10.00
|
Per copy
|
Standby Fire Company
|
$250.00 per hr.
|
Minimum 2 hrs.
|
|
|
|
|
|
|
|
|
|