§ 28-196. Cleanup of right-of-way.
In every case and at all times, the work of removing from the right-of-way all obstructions, surplus materials, debris and waste matter of every description caused by and accumulated from the excavation shall be the responsibility of the ROW user. Streets shall be cleaned by use of a street sweeper, on big projects. The ROW user shall clean the surrounding area, as outlined above, within two (2) days upon completion and approval of all trench work and pavement restoration unless the director has been given sufficient reason to grant an extension of time. Failure to leave work area clean will result in citation.
(Ord. No. 2009-O-045, 4-6-09)