Where casings are used for road crossings or other construction, the basic rate or
fee shall be computed on the basis of the diameter of the line to be cased and not
the casing.
(Ord. No. 2003-O-134, § 1, 6-2-03)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');